How to Calculate Solar Inverter and Battery Bank Capacity for a Solar Panel Array
How to size an off-grid or hybrid solar system from the ground up: daily kWh, panel array (kWp), inverter continuous and surge rating, and battery capacity for lithium and lead-acid banks.
Off-Grid & Hybrid Solar System Sizing Methodology
This guide walks through sizing an off-grid or hybrid solar system in the order you would actually do it: work out how much energy you use in a day, then size the panels, then the inverter, then the batteries. Each step feeds the next.
Power and Energy
Most sizing problems come from one part being out of proportion with the others, not from any single part being wrong. A big inverter on a small battery bank sags every time a motor starts and trips its low-voltage cutoff. A big battery bank on a small array never fully recharges, and a bank that lives at partial charge wears out sooner. Lead-acid sulfates, and lithium just wastes the capacity you paid for.
The easiest way to keep things straight is to size each part against what it actually has to handle:
Has to make enough kilowatt-hours, over your local peak sun hours, to cover a day's use plus losses.
Has to supply everything that runs at the same time, plus the short kick of a motor starting.
Has to hold enough energy for the night and for cloudy days, without being drained too deep.
Step 1: Work Out Your Daily Energy Use (kWh/day)
Everything after this depends on this number. Your monthly electricity bill gives a rough average, but it hides busy days and seasonal swings. For an off-grid system, list every load, its wattage and the hours it really runs in a day.
Daily energy is the sum of all of them:
Divide by 1,000 for kWh. Keep in mind that nameplate watts overstate anything that cycles on and off, like a fridge compressor. If you can, put a plug-in energy meter on it and use the real figure.
Don't forget the small stuff that never switches off
Routers, set-top boxes, cameras, chargers and clocks run all day, and they add up faster than you expect. A router drawing 15 W around the clock uses:
15 W × 24 h = 360 Wh/day (0.36 kWh/day)
Ten devices like that come to about 3.6 kWh a day, and even a handful can reach 1 to 2 kWh. After you total your audited loads, add another 10% to 15% to cover things you forgot and the inverter's own idle consumption.
The Ohm's Law calculator and the DC solar cable tool will do that for you.
Step 2: Size the Solar Array (kWp)
Once you know your daily energy, the question becomes how many watts of panels it takes to produce that on an ordinary day where you live.
Peak sun hours
Panels only hit their rated output in strong midday sun. Light starts near zero at dawn, peaks around noon and fades by evening. Peak Sun Hours (PSH) flatten that curve into one handy number.
One peak sun hour is 1 kWh of sunlight landing on each square meter, which equals one hour at the standard test intensity of 1,000 W/m2. If a roof receives 4,800 Wh/m2 over a day, that day counts as 4.8 peak sun hours. Look up the figure for the worst month you need to cover, not the yearly average. An off-grid system that works in June and fails in December is not much use.
Real-world losses (system efficiency, ηsys)
Panel ratings come from a lab test at 25°C cell temperature, 1 kW/m2 and AM 1.5 light. A real roof does worse, and the losses stack:
- Heat: cells in direct sun often reach 50°C to 65°C. Crystalline silicon loses roughly 0.35% to 0.40% of its power per degree above 25°C, so a hot day can cost you 10% to 15%.
- Dirt: dust, pollen and bird droppings commonly take 3% to 6%, and more in dusty regions.
- Wiring: voltage drop in string cables and connectors takes about 1.5% to 3%.
- Charge controller: a good MPPT unit is 96% to 98% efficient.
Multiply these together, using an average for heat since it is not at its worst all year, and you land at a typical overall efficiency of 0.75 to 0.80. Battery losses are handled later, in step 4.
Required Solar Array Formula
Number of panels: To get a panel count, convert the array size to watts, divide by the rating of the module you plan to use (400 W, 450 W, 550 W and so on) and round up. If your charge controller needs equal strings, round up to a whole string instead.
Step 3: Size the Inverter
Panels and batteries are sized by energy over a day. The inverter is different. It has to cope with whatever is running right now, plus the moment a motor starts.
Continuous power
Add up the AC appliances that could realistically run together. Say a well pump (1,200 W), a refrigerator (180 W), an air conditioner (1,500 W) and office computers (350 W) are all on at once. That is 3,230 W.
Then add a 20% to 25% margin, so the inverter is not working flat out all day and does not derate or shut down in the afternoon heat. For this example, 3,230 W × 1.25 is about 4,040 W.
Inverter continuous rating = Continuous load × 1.25
Start-up surge for motors
Pumps, compressors, fridges and power tools pull a burst of current when they start from standstill. This locked-rotor current is often 3 to 7 times the running wattage, and can be more for a hard-starting compressor. It can last from a fraction of a second to a few seconds.
Check the inverter's surge rating against your biggest motor. Many off-grid inverters, especially the low-frequency transformer type, can supply about 200% of rated power for several seconds, but this varies a lot between models, so read the datasheet. The estimator below assumes a surge of 2.5 times the continuous load. If one pump or compressor is the troublemaker, a soft starter can cut its start-up current considerably.
Power factor (kVA vs kW)
Motors, pumps and older ballast lighting draw current that is out of step with the voltage, so the inverter has to supply more volt-amps (VA) than the watts the load actually uses:
If your household power factor averages 0.85 to 0.90, a 4.0 kW load needs about 4.4 to 4.7 kVA before any safety margin. When comparing inverters, check whether the rating is in VA or in watts, because the two are not the same thing.
Try the Solar Inverter Output calculator and the Grid-Tie Sizing tool.
Step 4: Size the Battery Bank
The battery bank is usually the most expensive part of an off-grid system. Too small and it cycles deeply every day and wears out early. Too large and you have paid for storage the array can never refill.
Days of autonomy
Autonomy is how many days in a row the batteries can run your loads with little or no help from the panels or a generator.
- 1 to 1.5 days: fine for a hybrid system that can fall back on a reliable grid.
- 2 to 3 days: a common choice for off-grid homes in temperate climates.
- 4 to 5 days: for remote equipment like telecom repeaters, or sites with long rainy seasons.
Depth of discharge: lithium vs lead-acid
Draining a battery to empty shortens its life, so only part of its nameplate capacity is really usable. The share you plan to use is the depth of discharge (DoD). The figures below are typical, and the datasheet for the battery you actually buy always wins.
| Battery type | Recommended DoD | Round-trip efficiency | Typical cycle life | Usable capacity multiplier |
|---|---|---|---|---|
| Lithium iron phosphate (LiFePO4) | 80% – 90% | 94% – 96% | 3,500 – 6,000+ cycles | 1.11× to 1.25× load |
| AGM lead-acid | 50% | 80% – 85% | 500 – 800 cycles | 2.00× load |
| Flooded deep-cycle lead-acid | 50% | 75% – 80% | 600 – 1,000 cycles | 2.10× load |
| Gel lead-acid | 50% | 80% – 85% | 600 – 900 cycles | 2.00× load |
Choosing the system voltage: 12 V, 24 V or 48 V
Since P = V × I, the same load draws less current at a higher battery voltage, and current is what decides cable size, fuse size and heat.
- 12 V: campervans and systems under about 1,000 W. A 2,400 W load pulls 200 A at 12 V, which needs very thick cable.
- 24 V: small cabins and tiny homes, roughly 2,000 to 3,000 W.
- 48 V: the usual choice above about 3,000 W. Currents stay manageable, copper losses are lower, and most rack-mount lithium batteries are 48 V anyway.
Battery Bank Capacity Formula
Bank size in kWh: multiply amp-hours by system voltage: Ebank (kWh) = (Ah × VDC) / 1,000.
How It All Fits Together
The flowchart shows how one number, your daily energy use, feeds into the sizing of the array, the inverter and the battery bank.
Quick Sizing Estimator
Enter your own daily use, sun hours and load to get a first-pass size. It runs in your browser and uses the same factors as this guide: 0.78 system efficiency, a 1.25 inverter margin, 0.85 DoD for lithium and 0.50 for lead-acid. Treat the result as a starting point for talking to an installer, not a finished design.
Off-Grid System Capacity Modeler
Sizing Results
Worked Example: A Home Using 14.5 kWh/day
Here is the whole process for an off-grid house that uses 14.5 kWh per day, at a site with 4.8 peak sun hours.
| Part | Formula | Values | Result | What to buy |
|---|---|---|---|---|
| Daily load | sum (W × h) | 12.6 kWh base + 15% allowance | 14.50 kWh/day | Daily household demand |
| Solar array | Edaily / (PSH × ηsys) | 14.5 / (4.8 × 0.78) | 3.87 kWp | 9 × 450 W modules (4.05 kWp) |
| Inverter, continuous | Pcont × 1.25 | 3.80 kW × 1.25 | 4.75 kW | 5.0 kVA / 5.0 kW pure sine inverter |
| Inverter, surge | Prunning + Pextra at start-up | 2.0 kW base + 6.0 kW surge | 8.00 kW for about 5 s | 10.0 kW peak capability |
| DC bus voltage | P / V | 5,000 W / 48 V = 104 A | 48 V DC | Standard 48 V bus |
| Lithium bank (LiFePO4) | (E × Days) / (V × DoD × η) | (14,500 × 2) / (48 × 0.85 × 0.95) | 748 Ah (35.9 kWh) | 8 × 48 V 100 Ah rack batteries (800 Ah) |
| Lead-acid comparison | (E × Days) / (V × DoD × η) | (14,500 × 2) / (48 × 0.50 × 0.82) | 1,474 Ah (70.7 kWh) | 32 × 6 V 370 Ah flooded batteries |
Compare the two chemistries. For the same two days of autonomy, lead-acid needs almost double the nominal capacity (70.7 kWh against 35.9 kWh), and it is far heavier. Lithium costs more per kWh up front, but with so many more cycles it often works out cheaper over its life. Prices vary, so compare quotes for your area. Also, 748 Ah means eight 100 Ah units, because seven would fall short.
Five Common Sizing Mistakes
- Treating all of the battery as usable. Regularly running lead-acid far below 50% can shorten its life dramatically. Always include the DoD in your amp-hour calculation.
- Forgetting cold-weather open-circuit voltage (Voc). Panel voltage rises as temperature drops, typically by about 0.25% to 0.32% per °C. A string that looks fine on a warm day can exceed the controller's maximum input voltage on a freezing morning and damage it. Work out the cold Voc from the panel datasheet before you fix your string lengths.
- Ignoring the battery's current limit. Lithium batteries have a maximum continuous discharge rate, often 0.5C to 1C. A 5 kW inverter pulls about 104 A at 48 V. On a single 50 Ah battery rated at 0.5C (25 A), the BMS would cut out under load. Add up the combined rating of all your batteries and compare it with the inverter's maximum current.
- Using thin DC cable. Low-voltage DC means high current. Undersized cable between the batteries and the inverter drops enough voltage that the inverter shuts down on low voltage under heavy load, even when the batteries are still half full. Size it with the cable calculator linked above, and fuse every battery connection.
- Mixing up sun hours and daylight hours. If you design as though the panels make full power for 10 or 12 hours, you end up with an array less than half the size you need. Use peak sun hours from a local solar data source.
Frequently Asked Questions
Why is 48 V preferred over 12 V or 24 V for a home?
For the same watts, a higher voltage means less current. A 3,000 W load draws about 250 A from a 12 V bank, which needs very heavy cable and gets hot. At 48 V it draws about 62.5 A, so the cable is much thinner, standard breakers work, and resistive losses drop sharply. Real currents are a little higher once inverter losses are counted, and the cable size you need depends on your local code.
Can I add more panels later if my energy use grows?
Yes, as long as your charge controller or inverter MPPT has spare voltage and current headroom. If it is already maxed out, a second MPPT charge controller can feed the extra panels into the same 48 V battery bank. Just check that the battery and its cabling can handle the higher charge current.
What is the difference between pure sine wave and modified sine wave inverters?
A pure sine wave inverter produces smooth, grid-like AC that suits electronics, induction motors and variable-speed equipment. A modified sine wave inverter produces a stepped waveform that can make motors run hot and noisy, and can upset or damage some sensitive electronics. For a home system, pure sine wave is the safe choice.
How does temperature affect battery capacity?
Cold slows the chemistry, so a battery delivers less capacity in winter, and lead-acid loses a noticeable share near freezing. Lithium still discharges reasonably well around 0°C, but it must not be charged below 0°C (32°F) unless the battery has built-in heating. Charging cold cells plates metallic lithium onto the anode and damages them permanently. Many batteries have a BMS that blocks cold charging, so check yours.